Last night in the dark I found what i believed was my 10ft steel framed circular paddling pool and all the support framework. Amusingly (for me not the guys) when Jim, James and Steve went to setup the bestway they found that i had actually found a 4ft kids paddling pool. Thankfully 5mins later i found the right one and everything could start.
Once both vats were in place Steve setup the pipework to fill them both from the existing pond. In parallel, Jim and James set about the filtration with a retro bottom drain, 80 litre air pump and 8k pump to and eazypod.
An hour later with all that in place it was time to move which I thought would be a beast of a job. This is a picture of all the koi in the old pond (partially drained) before the move started
Thirty minutes later all the koi were in their temporary home for the next four to five weeks. That would have taken me hours! The following is a picture of the koi vats post koi move.
The finally came the job to empty the old liner pond and to punch some holes in it so if it did rain the water could drain through. No going back now!
No comments:
Post a Comment