Pages

Tuesday 7 May 2013

Filter house build progress, plus more soil and type 1

Steady progress today after the bank holiday Monday.

The placement of 100mm insulation sheets in between the timber frame of the filter house is complete on three of the four walls so that really moving forward with a burst.

 

The outer walls of the filter house have had their first coat of paint so again thats another positive step. We used Cuprinol Shades Natural Stone which is a really great colour but goes on very thin so its looking like it will need at three to four coats.

 

Another truck load of soil (40 tonnes) and two cubic metres of type 1 arrived and has been moved into place on the garden and pond edge so the levelling continues. Still a lot to go go though!

 

 

1 comment: